Delive- rable # |
Deliverable Title |
| D1.1 |
Plan for the exploitation of results |
| D2.1 |
Report on the drilling at Heletz (tsk_2.1, tsk_2.2) |
| D2.2 |
Report describing the installed facilities for CO2 injection (tsk_2.3, tsk_2.4) |
| D2.3 |
Report on the planning and execution of the CO2 experimental sequence at Heletz (tsk_2.5) |
| D2.4 |
Report on the results of the injection experiments at Heletz (tsk_2.6) |
| D2.5 |
Description of tests and data from the Hontomin site (tsk_2.8). |
| D2.6 |
Data gathering from the Reconcavo basin, Brazil |
| D3.1 |
Report on the monitoring experience at Heletz and Comparisons to Hontomin, Heletz, Baltic Gotland & |
| D3.2 |
Report on RTS downhole monitoring deployment and test at Heletz (tsk_3.2). |
| D3.3 |
Report on seismic passive & active monitoring (tsk_3.3) |
| D3.4 |
Report on flow and transport characterization, KIS tracers, and permeability distribution (tsk_3.4 a) |
| D3.5 |
Report of MMV data integration at Heletz |
| D3.6 |
Integrated visualization platform (tsk_3.6) |
| D3.7 |
Guidelines and recommendations for MMV technologies. |
| D4.1 |
Design simulations for the Heletz injection experiments |
| D4.2 |
Modeling approaches for the large-scale simulations |
| D4.3 |
Modeling and interpretation of the results of the injection experiments (Part1) |
| D4.4 |
Data set for model crosscomparison |
| D4.5 |
Model for the geo-mechanical simulations at Heletz |
| D4.6 |
Modeling and interpretation of the results of the injection experiments (Part2) |
| D4.7 |
Model results of the industrial scale simulations |
| D4.8 |
Conclusions from the code cross-validation |
| D5.1 |
Comparison of different CO2 injection modes at field scale |
| D5.2 |
Evaluation of dissolved CO2 injection |
| D5.3 |
Report on the effectiveness of different injection geometries |
| D5.4 |
Report onanalytical model
development and laboratory experiments on combination of dissolution |
| D5.5 |
Summary report of the findings of storage management |
| D6.1 |
Design and implementation of re-entry of Heletz-13 |
| D6.2 |
Optimized formulations and uses of the remediation fluid. |
| D6.3 |
Well mitigation procedure. |
| D6.4 |
Results on the performance of leakage monitoring |
| D6.5 |
Results of the leakage mitigation operations. |
| D7.1 |
Report on the Risk Assessment Strategy at Heletz |
| D7.2 |
Practical risk assessment analysis for the experiments at Heletz |
| D7.3 |
Report: Risk Assessment for Heletz and Comparison with Hontomin |
| D7.4 |
Draft for the certification and licensing procedure of Heletz |
| D8.1 |
TRUST website and intranet |
| D8.2 |
Lessons learned on communication and stakeholder involvement from previous and on-going CCS projects |
| D8.3 |
Dissemination strategy by the TRUST reflection group |
| D8.4 |
Lessons learned for effective regulation on CCS |
| D8.5 |
Template
addressing the liability issue for site certification and licensing.
|
| D9.1 |
Educational material for Heletz visitors programs |
| D9.2 |
First training course |
| D9.3 |
Second training course |
| D9.4 |
Third training course |
| D9.5 |
Summary report of the capacity building activities |
| D10.1 |
Summary report on characteristics of industrial scale site properties and scenarios |
| D10.2 |
Summary report of the large scale analyses models, model evaluation and extrapolation |
| D10.3 |
Recommendations for optimized monitoring strategies |
| D10.4 |
Recommendations and protocols for industrial scale certification, licensing, management and operation |